⚠️ Work in progress. This site is in active development and is auto-generated from an internal knowledge base. Details may be incomplete, out of date, or inaccurate — treat figures and statuses as indicative, not authoritative.⚠️ Travail en cours. Ce site est en cours de développement et est généré automatiquement à partir d’une base de connaissances interne. Les détails peuvent être incomplets, obsolètes ou inexacts — considérez les chiffres et les statuts comme indicatifs, sans valeur officielle.

OCHA Anticipatory Action Frameworks

Knowledge Base

HondurasDrought recently triggered

Anticipatory action framework lac-dry-corridor

Part of the 3-country lac-dry-corridor framework — see also Fait partie du cadre lac-dry-corridor couvrant 3 pays — voir aussi Guatemala · El Salvador.

CountryHonduras
HazardDrought
Monitoring periodMar–May, Jul–Sep (Inferred from trigger windows: Primera (MJJA) checked on the 5th of Mar (LT3)/Apr (LT2)/May (LT1) all countries; Postrera (SON) checked Jul–Sep (GTM/HND), Aug–Sep (SLV). Months are SEAS5 publication/decision months, not the forecast valid season.)
Area of interestEl Paraíso (Texiguat, Vado Ancho), Francisco Morazán (Curarén, Alubarén, Reitoca)
Current version2026-03-13 · valid until 2027
Trigger windows
Window A — Primera (MJJA) SEAS5 seasonal precip (mm) over priority departments: Per-leadtime RP thresholds (grid-searched); overall seasonal RP ≈ 1 in 3.5–3.9 yr
Window B — Postrera (SON) SEAS5 seasonal precip (mm) over priority departments: Per-leadtime RP thresholds; overall seasonal RP ≈ 1 in 3.9–4.4 yr (GTM), ≈ 1 in 3.9 yr (HND, SLV)
Pre-arranged financing$4.0M country envelope · framework total $10.5M (CERF $10.5M)
Budget by sectorFood Security $2.8M · WASH $0.4M · Health $0.4M · Nutrition $0.4M
Budget by agencyWFP $1.6M · FAO $1.2M · UNICEF $0.8M · PAHO $0.4M
Both dicts cover ONLY the Guatemala country document ($4M CERF envelope) — the SLV and HND country docs (the remaining $6.5M of the framework's $10.5M CERF) are annexes not in the extract. Food Security $2.8M = WFP $320k in-kind + WFP $1.28M multipurpose cash + FAO $1.2M agriculture. Guatemala cofinancing $372,464 (WFP $337,000 + FAO $35,464) excluded.
Framework document2026-03-13 ↗
Code repositoryds-aa-lac-dry-corridor ↗

Activation history

Real activations of this framework: the public trigger announcement and the CERF allocation that funded the response, with the people targeted and reached that CERF reports for the allocation (reported ~9 months after disbursement).Activations réelles de ce cadre : l’annonce publique de déclenchement et l’allocation du CERF qui a financé la réponse, avec les personnes ciblées et atteintes rapportées par le CERF pour l’allocation (rapporté ~9 mois après le décaissement).

DateWindowAnnouncementCERF allocationCERF approvedPeople targetedPeople reached
2026-03-05Window A (Primera 2026)announcementCERF-HND-26-RR-1520 ↗$4.0M65,000not yet reported
GTM + SLV + HND simultaneous three-country activation. ECMWF SEAS5 forecast for MJJA published 5 March 2026 reached the pre-agreed thresholds across the Dry Corridor frameworks. CERF released USD 4 million (GTM), USD 2.5 million (SLV) and USD 4 million (HND/Honduras) simultaneously — USD 10.5 million total for up to 145,000 people. First AA activation in both El Salvador and Honduras. GTM now covers four departments; SLV covers Ahuachapán and Santa Ana; HND covers El Paraíso and Francisco Morazán (up to 65,000 people).

Trigger statistics (current version)

Analysis period 1991–2024. Split funding: each window has its own budget and fires independently. Backtested years are when each trigger would have fired in the historical record — not real activations.Les années backtest sont celles où chaque déclencheur se serait déclenché dans l’historique — pas des activations réelles.

WindowAllocationReturn periodProbabilityBacktested activation years
Primera$4.0M3.5 years33%1991, 1994, 1997, 2009, 2014, 2015, 2018, 2019, 2021, 2023
Overall (any window)2.9 years34%

Previous versions

Earlier versions of this framework. Real activations listed here fired under that version's trigger design (details in the activation history above).Versions antérieures de ce cadre. Les activations réelles listées ici se sont déclenchées sous la conception de déclencheur de cette version (détails dans l’historique des activations ci-dessus).

2025-02 superseded

framework document · pre-arranged $10.5M

Analysis period 1981–2024. Split funding: each window has its own budget and fires independently. Backtested years are when each trigger would have fired in the historical record — not real activations.Les années backtest sont celles où chaque déclencheur se serait déclenché dans l’historique — pas des activations réelles.

WindowAllocationReturn periodProbabilityBacktested activation years
Primera$4.0M3.0 years33%1985, 1986, 1989, 1990, 1991, 1994, 1997, 2006, 2009, 2014, 2015, 2018, 2019, 2021, 2023
Overall (any window)2.4 years42%