⚠️ Work in progress. This site is in active development and is auto-generated from an internal knowledge base. Details may be incomplete, out of date, or inaccurate — treat figures and statuses as indicative, not authoritative.⚠️ Travail en cours. Ce site est en cours de développement et est généré automatiquement à partir d’une base de connaissances interne. Les détails peuvent être incomplets, obsolètes ou inexacts — considérez les chiffres et les statuts comme indicatifs, sans valeur officielle.

OCHA Anticipatory Action Frameworks

Knowledge Base

Burkina FasoFlood recently triggered

Anticipatory action framework bfa-flooding

CountryBurkina Faso
HazardFlood
Monitoring periodJul–Sep (West African monsoon flood season; SEAS5 trigger checked monthly Jul/Aug/Sep, CONASUR fallback runs concurrently through the same rainy season.)
Area of interestLiptako; Koulsé; Bankui; Yaadga; Djoro; Sourou
Current version2025-08 · valid until 2026
Trigger windows
Scenario 3: SEAS5 seasonal forecast (5 regions) SEAS5-monthly-precip-forecast: Region-specific per month (see table below): Liptako 5.04/7.55/3.77 mm, Koulsé 5.98/8.32/5.31 mm, Bankui 7.50/9.42/7.22 mm, Yaadga 6.29/8.65/5.47 mm, Djoro 5.96/7.04/6.75 mm (Jul/Aug/Sep)
Scenario 4: CONASUR observational alert + IMERG CONASUR-flood-alert, IMERG-observed-precip: CONASUR categorical alert (confirmed flood in target region, validated by IMERG precipitation data)
Scenarios 1 and 2: Mouhoun river gauge (DEFERRED to 2026) river-gauge-level-DGRE: Yaran station 416 cm (upper Mouhoun, 13–24 day lead); Ténado station 580 cm / 130 m3/s (lower Mouhoun, min 3-day lead); Pâ station 546 cm + ANAM 3-day rain forecast (Grand Balé)
Pre-arranged financing$1.0M (FHRAOC $1.0M)
Target people79,800
Framework document2025-08 ↗
Code repositoryds-aa-bfa-flooding ↗

Activation history

Real activations of this framework: the public trigger announcement and the CERF allocation that funded the response, with the people targeted and reached that CERF reports for the allocation (reported ~9 months after disbursement).Activations réelles de ce cadre : l’annonce publique de déclenchement et l’allocation du CERF qui a financé la réponse, avec les personnes ciblées et atteintes rapportées par le CERF pour l’allocation (rapporté ~9 mois après le décaissement).

DateWindowAnnouncementCERF allocationCERF approvedPeople targetedPeople reached
2025-09-08Scenario 3 (SEAS5 threshold, Liptako and/or Koulsé)announcementnon-CERF
Trigger fired 8 September 2025 based on SEAS5 forecasts. AAR (Feb 2026) classifies this as a 'fausse activation': anticipated floods did not materialize; late disbursements meant activities were implemented out-of-season. FHRAOC funds (1M USD) were released and activities deployed by APIL, OXFAM, ASMADE, OCADES-Dori in Liptako and Koulsé regions.

Trigger statistics (current version)

No published trigger statistics for this framework yet.